Your gateway to a wide range of natural resources information and associated maps

Victorian Resources Online

100. Heath Hill - Lang Lang River Incision

This information has been developed from one or more of these publications:

  • Sites of Geological and Geomorphological Significance in the Westernport Bay Catchment (1984) by Neville Rosengren.
  • Sites of Geological and Geomorphological Significance in the Western Region of Melbourne (1986) by Neville Rosengren
  • Sites of Geological and Geomorphological Significance on the Coast of Port Phillip Bay (1988) by Neville Rosengren.
  • Sites of Environmental Significance in the Flood Plain of the Upper Yarra Valley Region (1983) by Neville Rosengren, Douglas Frood and Kim Lowe (as part of a study of Sites of Environmental Significance by the University of Melbourne for the then Upper Yarra Valley and Dandenong Ranges Authority).
Geological heritage sites, including sites of geomorphological interest and volcanic heritage sites, are under regular revision by the Geological Society of Australia, especially in the assessment of significance and values.Reference should be made to the most recent reports. See the Earth Science Heritage section of the Geological Society of Australia website (external link) for details of geological heritage reports, and a bibliography.

Location:Catani - 860663. Lang Lang River floodplain at Heath Hill.

Image: Sites of Significance Port Phillip Bay
Former channel of Lang Lang River at Heath Hill (A), and diversion channel (B).

Access:

Western Port road.

Ownership:

Crown Land (Public Land Water Frontage Reserve), and private land.

Geology:

Exposed in the deeply incised channel of the Lang Lang River are silty sands and clays with occasional pebble layers. Wood fragments and coalified logs are common towards the bottom of the sequence (Thompson, 1974). Thompson (1970) referred to this sequence as the Heath Hill Silts, and regarded them as of fluvial origin and post-dating the main movement of the Heath Hill Fault. Near Western Port Road bridge, river incision had reached the base of the Heath Hill Silts and exposed basalts of the Older Volcanics.

Geomorphology:

Below the road bridge, the Lang Lang River follows an artificial alignment. It occupies a trench which is now deeply incised below the level of the former flood plain and adjacent drained swamplands. The area has a long history of drainage, reclamation, and flood control schemes, and the related phase of deep and rapid channel incision has been related to changes in stream gradient and discharge subsequent to those schemes. The site includes an abandoned course and floodway of the Lang Lang River immediately downstream from the bridge, and a sector of the New cut (a diversion drain cut in 1926 to shorten and straighten the river course). The temporary base level of stream downcutting is formed by outcrops of Older Volcanics basalt which are exposed at the Western Port Road bridge.

Significance:

National. The area is a classic site to demonstrate the rapid geomorphological changes that may accompany engineering works on river systems. The present phase of rapid incision and retreat of the knickpoint in the channel have been clearly documented and related to the drainage and other river control schemes implemented since the 1870's. It provides a major opportunity to study rapid river channel change and the impact of engineering works on landforms and geomorphological processes.

Management:

Class 1. The nature of future management of the site will need to be continually reassessed in the light of hazards created by the extension of channel erosion. It is very important that any future control or engineering works are preceded by detailed recording (by maps and photographs) of the characteristics of the site. This particularly applies to the nature of the channel cross section, the position of the knickpoint, and the composition of the channel floor materials. It is recommended that the abandoned channel section below the road bridge be left in its present configuration to serve as an indication of the dimensions of the channel before drainage programmes were implemented. Any construction or excavation activities that would obscure this section should be prohibited.

References:

Key, L. M. , 1967.
Historical geography of the Kooweerup District. M.A. thesis (unpub.) Dept. of Geog. Univ. of Melb.
Thompson, B. R. ,1974. The geology and hydrology of the Western Port sunklands. Geol. Surv. Rept. 1974/1
Thompson (1970).
Bird, J. F. , 1981. Geomorphological implication of flood control measures, Lang Lang River, Victoria. Aust. Geog. Stud. 169-183.

Image: Sites of Significance Port Phillip Bay
Deeply incised rejuvenated channel of Lang Lang River upstream from Heath Hill bridge.

Page top