Your gateway to a wide range of natural resources information and associated maps

Victorian Resources Online

Logging Alpine Ash in the East Kiewa River Catchment - Part II - Prediction of Sedimentation Effects in Junction Dam and Clover Dam

The principal aim of this study was to determine what additional level of sediment was likely to accumulate in Junction and Clover storages as a result of roading and logging within the A17 and Little Arthur Creek sub-catchment.

The study used the results obtained in Part I of the Report to estimate the potential increase in sediment contribution to the stream system arising from the proposed logging operations.

To view the information PDF requires the use of a PDF reader. This can be installed for free from the Adobe website (external link).

Logging Alpine Ash in the East Kiewa River Catchment - Part II
logggin_alpine_ash_kiewa_prt2.pdf
(PDF 726KB)
Page top